EV Chargers
An EV charger your switchboard can actually carry. We start with a load check, not a sales sheet, so you get the right charger for your supply and phase, load management where the board needs it, and the cost of any upgrade up front instead of after the deposit.
Load management keeps it under the limit.
A smart charger watches the main and backs off when the house draws hard, so the total never trips the supply.
What this job includes.
- ✓Home 7kW single-phase and 22kW three-phase chargers
- ✓Switchboard and supply load check before anything is quoted
- ✓Load management and OCPP for commercial, fleet and strata
- ✓Solar-smart charging from your excess generation
- ✓Destination and workplace charging with billing and access control
Size it for yourself, in three clicks.
A starting point using the same logic we use on site. Indicative only, not a quote.
Ballpark your electrical job
A guide range in under a minute, from a service call to a full solar and battery system. Every job is quoted on-site, with the workings shown.
Will your switchboard carry a charger?
The load check is the first thing we do on site. Get an early read in a minute.
Answer every question to see your readiness.
The same scope sheet, every time.
Whatever the job, your quote shows the load calc, the cable sizing and the compliance, so you can see exactly what you are paying for.
- 1 Load calculation. Your actual demand worked out and shown, not a system size guessed off the roof.
- 2 Cable sizing + run length. Sized for the inverter or charger and the distance, not the cheapest roll on the van.
- 3 Switchboard assessment. Spare capacity, RCD and surge protection, fault level. Checked before anything is added.
- 4 System sized to your bill. Solar and battery sized to your usage and load profile, not to the headline rebate.
- 5 Make + model, named. The exact panel, inverter, battery or charger on the quote, not "good panels".
- 6 Warranties, itemised. Product, performance and workmanship listed separately with their years, so you can compare like for like.
- 7 Compliance paperwork. CES, Certificate of Compliance and as-builts named as deliverables, plus STCs handled and shown as a line.
What happens, step by step.
Site + load assessment
We measure the load, read the switchboard, check supply and phase, and look at roof or cable routes.
Design + scope sheet
You get the load calc, cable sizing, the named equipment and an itemised quote. The workings are on the page.
Contract + schedule
Fixed scope, STCs and rebates shown as a line, a start date that fits your trading or build program.
Install
Licensed install to AS/NZS 3000, staged around live sites and tenants where needed.
Test + certify
Every circuit tested, RCDs proven, Certificate of Compliance issued. Solar and battery commissioned and monitored.
Handover + docs
As-builts, test results, warranties, monitoring set up, and a walk-through of how it runs.
The paperwork behind the price.
EC-00000 (DEMO), CEC A0000000 (DEMO), Public liability to $20M, and a 10-year workmanship workmanship warranty. All in writing, all on the quote.
Marcus walks through exactly what is covered: the licence and CEC accreditation you can verify, the cover that protects your site, and the warranty that names its own exclusions instead of hiding them.
EV Chargers jobs we’ve done.
Before
After Common EV Chargers questions.
Will my switchboard support a charger?
What is the difference between 7kW and 22kW?
Do I need load management?
What does an install actually cost?
Can I charge from my solar?
Does OCPP lock me to one app or network?
Get a free, itemised quote you can actually read.
Tell us what you need. We’ll book a walkthrough and send a quote with the work itemised, not just a number.